MECHANICAL INSTALLATION

WE METICULOUSLY CARRY OUT THE ENTIRE PROCESS OF MECHANICAL INFRASTRUCTURE AND SUPERSTRUCTURE ASSEMBLY OF THE PROJECT.

The process starts with the application of the footing points determined on the map to the site. Afterwards, the construction legs are nailed to the site or drilled and concreted.

After the foot assembly is completed, the lower and upper construction installation of the project is realized. With the completion of this step, the site becomes ready for panel assembly. The installation of the panels, which play a critical role in electricity generation, is also carried out in an extremely precise manner.

Installing a system that will provide energy generation requires not only the system but also the foundations on which the system will be placed to be robust. It must be able to produce solutions that vary according to different land types and project designs, and each stage must be completed with the same quality and attention. A healthy installation process ensures the efficient operation of the overall site as well as preventing failures. (CONTACT US)